Articles

Notes from
the workshop.

Practical writing on building software, using AI at work and keeping products healthy after launch. Written for founders and teams, not for other engineers.

Cut Compliance Risk: Swiss Web Analytics Choices and 2–4 Week Pilot

Compare privacy first and cloud analytics for Swiss sites. Learn EDÖB aligned configurations, a 2–4 week pilot plan, and when to hire Ampersand for rollout.

Read article
A chrome hand tally counter beside a closed visitor book on a museum reception desk.

7 Technical Due Diligence Domains Investors and Founders Must Verify

Due diligence checklist for investors & founders: verify seven technical domains with artifacts, interview prompts, and a remediation plan.

Read article
An opened typewriter on a felt mat beside a neat row of small trays holding its parts, the first tray holding a jeweller's loupe.

Stop Costly Rollouts: 4 Enterprise Axes for OpenAI vs Azure OpenAI

For engineering leads: Compare OpenAI and Azure OpenAI on four axes, billing, residency, quotas, developer friction, to avoid costly production rollouts.

Read article
Two similar 1980s desk telephones, one beige and one blue-grey, with four index cards laid out between them for comparison.

Swiss Cases: Choose Serverless or Containers by RPS and Runtime

Decide between serverless and containers using RPS, runtime, memory, and session state. Architect checklist with Swiss case evidence and practical notes.

Read article
A 1980s taxi meter with an amber display next to a toy lorry carrying three small shipping containers.

Swiss Handover Checklist: 6 essentials for construction and software

Swiss master handover checklist: include the six key documents, meet SIA/KBOB/Basel rules, and add software runbooks for smooth operations.

Read article
Rolled blueprints, a ring binder, a floppy disk and a key ring with an orange tag laid out on a counter, ready for handover.

Swiss Practice for Prioritizing Product Roadmaps: Tie Work to OKRs

Use an outcome first playbook to prioritize your product roadmap: pick a scoring framework, name a decision owner, and rescore every quarter.

Read article
A hand placing one orange card into the top slot of a mostly empty 1980s T-card planning board.

Fix Six WCAG 2.2 AA Gaps: Developer Checklist with Tests & Fixes

WCAG 2.2 developer checklist that prioritizes the six new AA criteria. One-line pass/fail tests, concrete fixes, and a sample workflow you can run in a...

Read article
A steel caliper measuring the smallest of four beige push buttons on a test panel, next to a clipboard checklist with six empty tick boxes.

90–180 Day Pilots Reduce Risk: Legacy System Migration for Swiss IT

Swiss guide: staged legacy system migration with 90–180 day pilots, EDÖB/FADP safeguards, and senior led delivery to cut risk and total cost of ownership.

Read article
A late-1980s signal box with old mechanical levers beside a new push-button panel, where one track section is already lit amber.

Stop Downtime: 7 Step Strangler Pattern Migration for Architects

Architects: replace a legacy monolith without downtime. A façade first 7 step plan, four required components, CDC and outbox safety, plus a senior led...

Read article
An old cord switchboard next to a new grey panel in a tidy 1980s telephone exchange, with three patch cords already moved to the new panel and one amber line lamp lit.

Avoid 74% Rollbacks: AI in Customer Support Built for Enterprise Ops

Run an operational-first AI pilot for enterprise customer support: shadow one workflow, stage authorizations, enforce governance, and integrate APIs to...

Read article
A 1980s desk telephone with two headsets connected through one splitter, one worn and one new, with a single amber line button lit.